Soil Engineering, Water Management
& Lagoon Design
KeyGS have been involved in the design and supervision
of the construction of numerous silt lagoon systems
and water management facilities in both hard rock and
sand and gravel quarries.
KeyGS designed a new water collection and
settlement system to meet the requirements
of the Environment Agency.
Photo A shows the old lagoon, Photo B shows
the area during construction and Photos C and D
show the completed lagoon.
KeyGS compiled the contract documents and
were responsible for supervising the lagoon
construction.
|
|
Click on the above images
to enlarge |
|